亚洲另类自拍丝袜第1页-丝熟少妇-www.操嫩逼-新婚学校一级毛片-曹B视频在线看-91精品情国产情侣高潮对白文档-欧美人妻免费看一区二区-久久精品一区二区三区综合-午夜77777

Using the 3Ddeposit modeling system to guide underground prospecting according to the mineralization regularity and the complicated geological structure, and many blind and edge ore-bodies are found. The main adit + main-auxiliary shaft development method and the electronic signal control system are adopted in underground transportation to improve the transportation efficiency; implements the “four modernizations” of development, such as mining mechanization, production and management frontline, construction team   miniaturization, quality management standardization; adopts the mechanical equipments such as drilling trolley, prying trolley, driverless railcar to realize mechanization and automation of drilling ,charging, mining, transportation, filling and so on.


a.jpg

b.jpg








Inspect and apply the advanced equipments such as drilling trolley, prying trolley, driverless railcar to realize mechanization and automation of drilling, charging, mining, 

transportation, filling and other procedures.








c.jpg

The beneficiation puts the coarse crushing in the underground to avoid the surface noise 

and dust pollution, and realizes the environmental protection, energy saving and efficient 

utilization.

dd.jpg

The main adit + main-auxiliary shaft development method and the electronic signal control system are adopted in underground transportation to improve the transportation efficiency.









?